From takeoff to client proposal: what a bid-ready commercial roofing proposal has to show

By The Sharp Pencil team

Disclosure: Sharp Pencil sells commercial roofing takeoffs, so we have a stake in this topic.

This is a checklist, not contract or legal advice. Your bid documents and your own terms decide the final wording.

Last updated: 2026-10-30. Live facts checked on 2026-10-30.

What should a commercial roofing proposal include after the takeoff?

The system and attachment, tear-off or recover, insulation and cover board, line items by unit, flashings and edge, alternates, inclusions and exclusions, addenda acknowledged, the warranty named, and the open questions. Each line should trace back to a quantity in the takeoff. Every quantity carries its source sheet and its basis.

Short answer

A bid-ready proposal names the system by membrane, thickness and attachment, says tear-off or recover, and lists the insulation and cover board. It shows line items by unit, straight from the takeoff, plus flashings, edge, penetrations and any steep slope areas. It lists alternates, inclusions, exclusions and assumptions, the addenda you acknowledged, the warranty, and the questions still open. If a reader cannot match a line to the plans, it is not ready.

Start from a takeoff you can defend

A proposal is only as clear as the quantities under it. If a quantity has no sheet behind it, the proposal line has nothing to stand on. See roofing takeoff vs estimate for where the takeoff ends and the estimate begins.

Name the system the way the spec does

Write the membrane type, thickness and attachment (for example "60 mil TPO, mechanically attached"), the insulation layers, the cover board, and whether it is tear-off or recover. For steep slope, name the standing seam profile and gauge, or the shingle line and underlayment, as specified. See tear-off vs recover takeoff and how to read Division 07 for a roofing takeoff.

Line items by unit, straight from the takeoff

Each proposal line should match a takeoff line you can point to.

Table 1. Takeoff line to proposal line.
Takeoff line Unit What the proposal line says
Field membrane SF or SQ System, thickness and attachment
Insulation and cover board SF, by layer Thickness or R-value as specified, tapered if shown
Base and curb flashing LF and EA Heights and count of curbs
Edge metal and coping LF Profile and finish as specified
Drains and penetrations EA Count, by type
Walkway pads LF or SF As shown on the roof plan
Steep slope field SQ Shingle or standing seam, by area
Ridge, hip, valley, rake, eave LF Each listed, not lumped

See tapered insulation takeoff, edge metal takeoff, standing seam metal roof takeoff and asphalt shingle roof takeoff.

Alternates and unit prices go on their own lines

Each alternate gets its own line and its own quantity, never folded into the base bid. Unit prices state the unit they apply to. See bid alternates and unit prices.

Inclusions, exclusions and assumptions

Some items need a line one way or the other, so the reader is not left guessing.

Table 2. Common items to state one way or the other.
Item Why it gets a line
Wet insulation replacement A moisture survey can find it, but the full quantity is often not known until tear-off. State a unit or an allowance as your terms allow
Deck repair Deck condition is not known until the old roof is off. State a unit or an allowance as your terms allow
Rooftop unit disconnects and resets May be done by HVAC or electrical trades. Say who does it
Permits, bonds, taxes Bid documents differ
Work not on the roof plan See the items list
Anything you assumed Write it down so the reader can see it

See roofing bid items not on the roof plan.

Addenda, warranty and the open questions

A one-page check before it goes out

Table 3. Before you send.
Check Pass when
System named Membrane, thickness, attachment, tear-off or recover
Every line has a unit No lump sums without a quantity behind them
Alternates separate Each has its own line
Exclusions written Nothing left to assumption
Addenda listed Number and date for each
Questions shown Each open question is stated

Where the takeoff hand-back fits

You build the proposal. The takeoff gives you the quantities to build it from. Every quantity carries its source sheet and its basis.

Four files: START HERE, marked-up drawings PDF, Takeoff.xlsx with a Questions tab, and the material order list.

Pricing is optional. Send your cost data and we apply your prices to the quantities. Any line you have not priced comes back marked UNPRICED. See takeoff to material order and a sample takeoff.

FAQ

What should a commercial roofing proposal include?

The system and attachment, tear-off or recover, insulation and cover board, line items by unit, flashings and edge, alternates, inclusions and exclusions, addenda acknowledged, the warranty and the open questions.

Should a roofing proposal show quantities?

Showing the unit and quantity on each line lets the reader compare your proposal with the others line for line. How much detail to show is your call.

Where do exclusions come from?

From the takeoff and the bid documents. Anything you did not measure, could not measure, or assumed belongs on the list.

How do I handle alternates in a proposal?

Give each alternate its own line and its own quantity, separate from the base bid.

What if the addenda change the scope after the proposal is written?

Update the changed lines from the takeoff, then update the proposal and list the addendum by number and date.

What does Sharp Pencil send back on a takeoff?

Four files: START HERE, marked-up drawings PDF, Takeoff.xlsx with a Questions tab, and the material order list. Every quantity carries its source sheet and its basis. Usually within one business day. Delivered within 48 hours*.

*Clock starts once any questions we send you are answered.

Why send it to us

Residential is not our focus today, but ask if you have a job in mind.

*Clock starts once any questions we send you are answered.

Try it on a job you are bidding

Get your first takeoff free · $395 per takeoff · See a sample takeoff

The Sharp Pencil team