What to send with a plan set for a commercial roofing takeoff

By The Sharp Pencil team

Last updated: 2026-11-10.

What should I send for a commercial roofing takeoff?

The full drawing set (architectural, structural, mechanical and plumbing), the roofing spec sections, every addendum issued so far, and a short note on scope, alternates and bid date. A roof plan alone leaves questions open.

Disclosure: Sharp Pencil sells commercial roofing takeoffs, so we have a stake in this topic.

The short list

The more of the set we have, the fewer questions we send you later. A roof-plan-only upload is almost never enough.

We take off steep slope (standing seam, shingle) and commercial low slope (TPO, EPDM, PVC, mod bit, BUR) from the full set. Send the full set for either one.

Table 1. What to send with a commercial roofing plan set.
ItemWhy the takeoff needs itIf you don't have it
Full drawing set, all disciplinesDrains, curbs, deck and heights sit off the roof planSend what you have. Gaps go on the Questions tab
Spec book or Division 07 sectionsSystem, attachment and insulationA question goes on the Questions tab
Addenda issued to dateChanged sheets and spec sectionsNote the last addendum number
Alternates and unit prices, in a short noteWhich lines to split outSay "none"
Scope note: new, tear-off, recover or repairSets the linesPick "Not sure, read the documents" on the upload form
Bid dateHelps us plan the Questions tab around your deadlineOptional

For which sheets a roofing takeoff reads, see the sheets a roofing takeoff has to read. For the spec sections, see reading Division 07 for a roofing takeoff.

Files and formats

PDF or ZIP. Up to 20 files, 2 GB each. Large files upload in pieces.

Leave out bid forms, reports and photo sets.

If you have a 3D model, send PDF sheets exported from it. The upload form takes PDF or ZIP only. See how a Sharp Pencil takeoff works.

What slows a takeoff down

Each of these becomes a question on the Questions tab.

See the roofing RFI register.

When the clock starts

Usually within one business day. Delivered within 48 hours*.

*Clock starts once any questions we send you are answered.

What you get back

Four files: START HERE, marked-up drawings PDF, Takeoff.xlsx with a Questions tab, and the material order list. Every quantity carries its source sheet and its basis.

Pricing is optional. Send your cost data and we apply your prices to the quantities. Any line you have not priced comes back marked UNPRICED.

See a sample takeoff and commercial roofing takeoff services.

FAQ

Can I send just the roof plan?

You can, but a roof plan alone leaves drains, curbs, heights and the attachment method open, and each one becomes a question on the Questions tab.

Do I need the spec book?

Send the roofing sections if you have them. If the spec is missing, the takeoff names what it could not confirm.

What if an addendum comes out after I upload?

Send the addendum when you have it. See how addenda change a roofing takeoff.

How long does a takeoff take?

Usually within one business day. Delivered within 48 hours*. *Clock starts once any questions we send you are answered.

What does it cost?

$395 per takeoff. $395 covers a new set of drawings, or a new address. First takeoff free, one per contractor, on a job you're bidding or quoting.

Your plans stay yours

A plan set you send us will never be used to compete with you, and plan sets are deleted whenever you ask. More on whether outsourced takeoffs are confidential.